The most common reason a good pilot never starts is that somebody assumed it needed a committee.
It does not. It needs one person who owns the site and can say yes, and two or three supervisors willing to have alerts on their phones for a month. That is the entire org chart of a 30-Day Pilot.
Not IT for a hardware project, because there is no hardware. Not procurement for a capital request, because we use the cameras you own. Not a corporate steering group, because we are doing one building, not a standard.
The reason I push for this is not speed for its own sake. It is that a decision made by the people who watched it work on their own floor is worth ten times a decision made from a summary slide, and it is the only version that survives contact with the other thirteen plants later.
210+ plants and 1,150+ locations got started this way. Setup in 5 days or less, results inside 30 days.
If you are the person who could just say yes, send me a message and let’s start there.
Originally posted on LinkedIn by Alejandra Ramirez. See the post and the discussion on LinkedIn.






