A refrigeration contractor shows up at 6 in the morning to look at a chiller. He signs in at the gate, and then he walks the shortest route to the equipment, which happens to run straight past a live filler at head height.
Nobody did anything wrong exactly. The site briefing happened, in a room, three weeks ago, for a different technician from the same company. The person actually on your floor this morning has never been here before and does not know which yellow line means what.
Contractors are the widest blind spot I see in otherwise sharp plants. They are on site the least and they are the least trained on your specific hazards. Braingine watches the areas they move through on your existing cameras and alerts when anyone enters a restricted zone or an exclusion area around running equipment, whether or not that person is on your payroll.
We do this in 210+ plants and 1,150+ locations. Setup is 5 days or less, results inside 30 days.
If you have contractors on site this week, send me a message. A 30-Day Pilot on one building will show you where they actually walk.
Originally posted on LinkedIn by Alejandra Ramirez. See the post and the discussion on LinkedIn.






