When a multi-site operator asks about rolling this out to fourteen plants, my answer is always the same: let’s do one.
Not because we cannot handle fourteen. Because an enterprise rollout has to be approved by everyone, and a single site has to be approved by the person who runs it. One of those takes 5 days and the fourteen-plant version usually gets decided on the strength of a slide deck instead of on your own floor.
Pick the site that hurts. The one with the near-miss log you do not like, or the aisle everybody argues about. Thirty days later you are not debating whether camera-based safety monitoring works in theory, you are looking at what happened in your building, on your shifts, with your supervisors telling you whether the alerts were useful. That conversation scales to fourteen plants on its own.
It is how we got to 210+ plants and 1,150+ locations. Setup in 5 days or less, results inside 30 days.
Send me a message with the site that hurts most and let’s start there.
Originally posted on LinkedIn by Alejandra Ramirez. See the post and the discussion on LinkedIn.






