Week one of a pilot is loud. The system is new, the zones are freshly drawn, and your supervisors get more alerts than they want. That week is for tuning, and everybody expects it.
Week two the volume drops and something more interesting starts. The supervisors stop treating alerts as a system output and start treating them as information. “That aisle again.” “Same door, third time this week.”
Week three is the one I care about. By week three the conversation has usually moved off the software entirely and onto the floor. Somebody moves a pallet staging spot. Somebody changes where the empty totes go so the exit stops getting blocked. The alerts for that specific problem drop, and nobody had to run a formal project to make it happen.
Week four you look back at the whole month and decide. That arc is what 30 days is for, and it is why we say results inside 30 days rather than results eventually. 210+ plants and 1,150+ locations, up in 5 days or less.
If you want to see your own week three, send me a message and let’s put a 30-Day Pilot on one site.
Originally posted on LinkedIn by Alejandra Ramirez. See the post and the discussion on LinkedIn.






