“We tried a pilot like this. It went nowhere.” I get that one a lot and it is usually fair.
When I ask what happened, the story is almost always the same shape. It ran for six months. It needed new cameras or a new network segment. It produced a dashboard that one person in corporate looked at. And when it ended, nobody on the floor could tell you what had changed, so nobody fought to keep it.
That pilot did not fail on technology. It failed on structure. Six months is long enough for the sponsor to change jobs. A dashboard nobody opens cannot build a case. And any project that starts with a hardware order starts with a delay you never recover from.
Ours is deliberately the opposite: existing cameras, up in 5 days or less, alerts that go to supervisors on the floor rather than to a screen upstairs, and a decision at day 30 based on what happened in your building. Short enough that the people who started it are still there to judge it.
That structure is running at 210+ plants and 1,150+ locations.
If your last pilot died quietly, send me a message and let’s run this one differently.
Originally posted on LinkedIn by Alejandra Ramirez. See the post and the discussion on LinkedIn.






