Lockout is not usually skipped on big jobs. Nobody rebuilds a drive without isolating it. Lockout gets skipped on the jobs that only take a second.
A scrap of stock wrapped where it should not be. A sensor that needs a wipe. The kind of thing where walking to the panel, applying a lock and filling out the tag takes eight times longer than the fix itself. So a hand goes in with the machine live, because it is quick, and because the alternative feels absurd for a two second job.
Nip points do not care how long you planned to be in there. That is the whole reason the standard exists, and everybody on your floor could recite it back to you.
Braingine watches the areas around those rollers on the cameras already covering them and alerts when a person reaches into a running nip zone. Not to run a compliance audit. To catch the two second job before it becomes the one that everybody remembers.
210+ plants and 1,150+ locations, up in 5 days or less, results inside 30 days.
If your lockout program is solid and your quick fixes are not, send me a message about a 30-Day Pilot.
Originally posted on LinkedIn by Alejandra Ramirez. See the post and the discussion on LinkedIn.






